+ 0380112528
No. 61-2, 2nd Floor, Jalan USJ 21/11, USJ 21 47640 Selangor
kcaabadi@gmail.com

NEM NOVA

SELF CONSUMPTION (SELCO) Apart from Net Metering, SELCO is another option for you to generate electricity from your own solar PV system, to offset or reduce your electricity bills. SELCO lets you consume all the electricity generated by your solar system but will not allow any excess to flow into the utility network. You are required to present to TNB the power flow study of the proposed connection of your generating plant/source (if the installed capacity of the solar PV system is 425kW and above) so we can identify whatever effects it may have on the utility network. For information regarding licensing requirement, please refer to www.st.gov.my. The customer is required to register the solar PV system installation by submitting the following documents: Self-Consumption Solar PV System Registration Form; A certified copy of the drawings, plans and specifications including any subsequent approved amendments and modifications by the suitably qualified competent person; A PSS report endorsed by DL subsequent to the PSS presentation (if applicable) Completion Certificate and Test Certificate for the installation shall be in Form G and Form H as prescribed in the First Schedule, Electrical Regulations 1994.
| Free Consultation Call
  • Our Projects

NEM NOVA

SELF CONSUMPTION (SELCO) Apart from Net Metering, SELCO is another option for you to generate electricity from your own solar PV system, to offset or reduce your electricity bills. SELCO lets you consume all the electricity generated by your solar system but will not allow any excess to flow into the utility network. You are required to present to TNB the power flow study of the proposed connection of your generating plant/source (if the installed capacity of the solar PV system is 425kW and above) so we can identify whatever effects it may have on the utility network. For information regarding licensing requirement, please refer to www.st.gov.my. The customer is required to register the solar PV system installation by submitting the following documents: Self-Consumption Solar PV System Registration Form; A certified copy of the drawings, plans and specifications including any subsequent approved amendments and modifications by the suitably qualified competent person; A PSS report endorsed by DL subsequent to the PSS presentation (if applicable) Completion Certificate and Test Certificate for the installation shall be in Form G and Form H as prescribed in the First Schedule, Electrical Regulations 1994.
  • Contact Information

Our Offices:

No. 61-2, 2nd Floor, Jalan USJ 21/11, USJ 21 47640 Selangor.

Business Development & Engineering Office:

No. 61-2, 2nd Floor, Jalan USJ 21/11, USJ 21 47640 Selangor.

Sale & Marketing -The Pole Maker
Factory:

No. 61-2, 2nd Floor, Jalan USJ 21/11, USJ 21 47640 Selangor.
©2024 Kejuruteraan Cahaya Abadi Sdn Bhd. All Rights Reserved.